In such cases, PD date will be decided by the appropriate committee through witness and ledger after site inspection No Meter Cable (NMC) at site PD : If no meter cable found at site and no information regarding its temporary disconnection is available.PD Date will be after 6 months of temporary disconnection date. If the cause for which the supply was temporarily disconnected is not removed within six months period. ![]()